Tag Keyword:

wetlands

Ellsworth’s Center Redevelopment

ACT Engineers is currently working on the redevelopment of this existing shopping center located in West Windsor. Currently, the center consists of 4 separate buildings that share a central parking lot. The design includes the demolition of one existing building, …

Princeton Theological Seminary

ACT prepared a Storm Water Management Master Plan for the residential campus of the Princeton Theological Seminary for the redevelopment of the 65 acre site. Topographic surveying and mapping of underground utilities, regulated wetlands, and DRCC buffers were prepared for …

South Lot Parking Area/Landfill Closure

This Brownfield project involved the redevelopment of a former municipal landfill into a community asset.  Through creative planning and continued coordination with Township officials and State regulators, ACT has successfully navigated this project to construction (on-going).  With a targeted in …

Washington Crossing Bridge Rehabilitation

As part of the Rehabilitation team, ACT Engineers was responsible for topographic survey, base mapping, wetland delineation, stake-out, permitting and coordination with multiple stakeholders and regulatory agencies throughout the rehabilitation and Concept Study process.  

D&R Canal Restoration Dredging

This project involves the restoration of original construction depth of 10.5 miles of the Delaware and Raritan Canal in Franklin Township, Somerset County to support on-going drinking water demand. ACT Engineers, Inc., as part of the Design Team, established the …

NJSIAA Facility Expansion

This project involved the development of a 100-space parking lot expansion on an existing site and the redevelopment of the Storm Water Management strategies to utilize Best Management Practices.  The design goals included meeting the pending Phase II storm water …

Mercer Corporate Center

ACT Engineers coordinated multiple regulatory approvals while designing this new 4-building complex which encompassed 300,000 sf of Class A office space.  Both the Bureau of Land Use Regulation and the Bureau of Site Remediation had oversight of this complex project.  …

McGuire AFB/Fort Dix Survey

ACT Engineers, Inc. has surveyed the Fort Dix Fence Line around the 11,000-acre cantonment area.  Scope included collection and submission of GIS data which distinguished pre-2002 fence section frompost-2002 and to-be-constructed fence sections.   The projects involve a full range of …

Delaware River Joint Toll Bridge Commission Headquarters Expansion

ACT Engineers surveyed, designed and provided permitting services to the Delaware River Joint Toll Bridge Commission to construct an addition to the existing New Hope Toll Plaza/Administration Building.

Biles Island Master Plan

Falls Township engaged ACT Engineers, to prepare a Master Plan for Biles Island. The Island, which consists of approximately 525 acres along the Delaware River, is currently owned and operated as a Mining Site by Waste Management and as a …