Newark Energy Center Generating Center

This electrical generation project included the evaluation of all facility permits and optimization of site grading for construction.  Site Grading included the balancing of all Wetland Delineation, Flood Hazard Elevations, Baseline Environmental Assessment and project remediation goals and permit requirements while adhering with construction costs and equipment layout requirements.  Field activities included Soil Permeability Testing, Construction Program Management, and Health and Safety Coordination.

This fast paced project required the procurement of permit modifications and compliance with NJDEP Land Use and Site Remediation Requirements. In addition, ACT assisted the  Client to coordinate with the Owner, Electrical Designer, and Licensed Site Remediation Professional to optimize the site grading, stormwater management and environmental cap designs.

Project Features

  • Flood Hazard Permitting
  • Wetland Permitting
  • Stormwater Managment Design
  • Construction Design Coordination
  • Soil Permeability Testing
  • Permit Review
Additional project details are only available to registered users to the ACT Engineers website.

ACT”S Role

  • Permit Evaluation
  • NJDEP Flood Hazard Permit Modification
  • Soil Testing
  • Stormwater Management Design
  • Site Grading
  • Construction Permitting Assistance