ACT Engineers coordinated multiple regulatory approvals while designing this new 4-building complex which encompassed 300,000 sf of Class A office space.  Both the Bureau of Land Use Regulation and the Bureau of Site Remediation had oversight of this complex project.  Constraints included extensive wetlands and soil permeability issues as well as on-site soil contamination.  This site encompasses 50 acres bisected by a natural drainage feature and bordered by an active railroad.

Project Features

  • Pedestrian Bridge
  • Culvert Crossing
  • Phased Development
  • Subsurface Stormwater Management
  • Wet Pond Design
  • Low Environmental Impact Design Components
Additional project details are only available to registered users to the ACT Engineers website.
 
ACT’s Role
  • Environmental Due Diligence
  • Topographic Survey
  • As-Built Survey
  • Site Planning
  • Soil Remediation
  • Roadway Design
  • Storm Drainage Design
  • Hydrology-Hydraulics Analysis
  • Municipal-County Approval
  • Permitting
    • Flood Hazard Area
    • Wetlands
    • Soil Erosion Control
    • Water Main Extension
    • Treatment Works Approval
  • Sanitary Pump Station Design
  • Value Engineering
  • Landscape Design
  • Lighting Design
  • Permit Compliance
  • Field Engineering (Phase I)